MWM gas generator sets
MWM gas generators are highly efficient units with German quality, designed for stable, economical and environmentally friendly generation of electricity and heat. They are suitable for industrial enterprises, data centres, the agricultural sector and housing and communal services facilities.
Advantages
Up to 90% efficiency
in cogeneration modes
01
Energy
cost savings
02
Reliable operation
under any load
03
Runs on biogas
and alternative fuels
04
Maximum efficiency and reduction of energy losses
Minimum fuel consumption at high power
Reliability during prolonged and variable operating conditions
Fuel flexibility and environmental friendliness
Where it is applied
Industrial enterprises
Data centres
Agricultural complexes and biogas farms
Commercial buildings and infrastructure
10 years of experience in engineering solutions and construction
Mach Engineering & Construction LLP is a Kazakhstani engineering and construction company specialising in the design, supply and installation of power
and process equipment.

We support projects from concept to commissioning, ensuring reliability, energy efficiency and long-term support.
Our areas of expertise
Gas generator sets
Cogeneration, trigeneration, biogas, hybrid solutions
Gas generator sets
Cogeneration, trigeneration, biogas, hybrid solutions
Architectural, engineering and technological design
Comprehensive supply and commissioning
Training, diagnostics,
scheduled maintenance and repairs
Design and construction
Architectural, engineering and technological design
Design and construction
Delivery and commissioning of equipment
Comprehensive supply and commissioning
Delivery and commissioning of equipment
Service maintenance
Training, diagnostics,
scheduled maintenance and repairs
Service maintenance
Why choose us
10+ years of experience
01
02
03
04
in the design and installation of industrial facilities
10+ years of experience
Gas generator sets
01
in the design and installation of industrial facilities
from design to service support
for all types of engineering activities
throughout Kazakhstan —
from Almaty to Aktobe
Comprehensive approach
02
from design to service support
Comprehensive approach
Official licences
Completed projects
03
04
for all types of engineering activities
throughout Kazakhstan —
from Almaty to Aktobe
Official licences
Completed projects
Government licences and certification
Completed projects
We are proud to have participated in the creation of Kazakhstan's largest facilities. Each project is the result of engineering precision, teamwork and attention to detail.
Cogeneration plant, Turkestan
Construction of a 12×2.3 MW (27.6 MW) gas piston cogeneration plant for a data centre.
Construction of a 40 MW pumped storage power plant with reconstruction of the AGRS for power supply to the mining and metallurgical complex.
Construction of a maintenance and repair bay for dump trucks as part of the reconstruction of the Kacharsky quarry.
Electrical installation work on auxiliary buildings at the country's largest medical centre.
Installation of prefabricated busbars for the power supply system of the bank's data centre.
Electrical installation and low-voltage work for the 5th launch complex of BAKAD.
Renovation of the Ramstore All In multifunctional complex.
Construction and installation works for the Ramstore supermarket as part of the MEGA Silk Way shopping and entertainment centre
Gas piston power plant, Aktobe
Box TOiR, Kacharsky Quarry
National Scientific Centre for Infectious Diseases, Almaty
Bank data centre, Almaty
The Greater Almaty Ring Road (BAKAD)
Ramstore All In, Almaty
MEGA Silk Way Shopping Centre, Astana
2025 — in progress
2025 — in development
2025
2024
2024
2023
2017
2017
Our Partners